Manufacturing Excellence
Inside Our Production Workflow
From raw cylinder preparation to gas filling, inspection, packaging, and export, every step is controlled in-house to ensure stable quality and reliable supply.
01
Cylinder Preparation
Incoming cylinders and components are checked before production, including surface condition, dimensions, and compatibility with filling requirements.
02
Gas Filling
Automated filling equipment supports stable N₂O and CO₂ filling with controlled pressure, weight, and production consistency.
03
Leak Testing & QC
Each batch goes through leak detection, weight inspection, valve checking, and final quality control before packaging.
04
Packaging & Export
Finished products are packed according to OEM requirements, with export documentation and logistics support for global delivery.